给我免费播放片高清在线观看7,国产三级精品三级在线观看国,在线√天堂中文bt,日本 在线 免费,欧美国产男人的天堂,亚洲精品乱码久久久久久电影,精品久久久1区,亚洲国产成人久久精品91,猫咪大香蕉av,精品国产99久久久久人人

  • <abbr id="ska0w"><option id="ska0w"></option></abbr>
    <strike id="ska0w"></strike>
  • <tfoot id="ska0w"><center id="ska0w"></center></tfoot>
  • <dfn id="ska0w"></dfn>
    • Welcome to visit zhong wei
    • Green and environmental protection
    • Products have anti-static floor
    • Aluminum ceiling, color plate, grille lamp

    news

    position:主頁(yè) > ENGLISH > Technical Support > news >
    knowledge news

    Flooring should be installed before or after the

    來(lái)源:中為 瀏覽次數:

    0

    When first gate or the questions the first floor debate for a long time, small think best is to install the back door. Several claims for everyone as a reference: 
    1. gate precisely to ensure that after the first floor doors and gaps between the floor size. If gate flooring will have one question, is the gap between the door and floor remain larger than small, unsuitable to do? Although for skilled of installation workers can first through advance told floor of thickness to reserved scale, but any engineering are is has errors has variables of (to flat errors led floor errors, and door errors), door big has will ugly and noise role also poor, door small has, a has can door and floor will conflict, II has can due to future wood floor bulge Alice song or door slightly sinking on mutual conflict. 
    2. loading the back gate to avoid loading door and flooring often floor between the door frame and a variety of special angle and scale installation difficulties, avoiding the cartridge door floor floors combined with difficulties between the frames. 
    3. first ensures the door frame on the floor after floor, door frames and floor gap between glass glue will form on elastic contact, ensure that moisture does not enter from the fracture surfaces of the door frame to door deformation. 
    of course, if the gate after the first floor will also have several questions: 
    1. relatively heavy, are able to hit the floor, walked up and down and workers are able to scratch the floor. 
    2. gate with a certain amount of glue and wood ashes, soiled floor. 
    3. no gate, skirting the floor well shut. 
    but this is not a large problem, solution is as follows: 
    1. mounted around the front door with cardboard and other information covering the floor protected. 
    2. can require workers to corridor or terrace, cleaned local cutting saws information, to avoid dust. 
    3. baseboard will not load, loading door again to put door or the door a kick line to leave a little length, do not nail, after installing your door gate workers according to the actual situation of the kick line cut and fitted.

    更多產(chǎn)品歡迎咨詢(xún):

    TEL:186-9225-1673

    公司電話(huà):0731-88731697

    公司網(wǎng)址:www.zwxcl.com

    上一篇:Also need to fill water and lock the floor water 下一篇:沒(méi)有了
    相關(guān)產(chǎn)品
    HOME  | About  | Products  | Technical Support  | CASE  | Contact

    address:6th floor, building 1, xincheng science park, 588 yuelu west avenue, changsha high-tech development zone

    TEL:0731-88731697 phone:186-9225-1673

    Record number:湘ICP備15012871號-1

    Message Board

    >在線(xiàn)客服
    QQ咨詢(xún)
    客服電話(huà)

    0731-88731697

    陳經(jīng)理

    微信公眾賬號
    欧美深喉第一页| 国产成人久久久精品一区二区三区| 欧美成综合网网站| 亚洲 自拍 另类小说综合图区| 色网站在线观看免费| 欧美日韩一二三四区在线| 国产精品亚洲欧美日韩一区在线| 日韩精品一区二区三区免费视频| 日韩精品一区二区三区视频播放| 成人性生交大片免费看在线| 中国人妻被两个老外三p| 激情综合色综合久久综合| √天堂中文官网在线| 久久精品蜜桃91| 国产成人欧美一区二区三区在线| 亚洲精品97久久中文字幕无码| 九色最新视频在线观看| 久久影院国产| 国内自拍第1页| 亚欧乱色熟女一区二区小说| 欧美精品中文字幕亚洲专区| 99riav国产精品视频| 最新亚洲精品国偷自产在线| 国产97色在线丨日韩| gogo999亚洲大胆裸体艺术| 在线免费日韩av电影| 亚洲国产精品一区| 91精品在线看| 精品国产乱码AAA一区二区| 国产午夜亚洲精品| 在线视频三区| 国产精品99久久久久久小说| 人妻系列无a v码专区| 国产五月天在线| 久久这里只有精品首页| 久久97精品久久久久久久不卡| 一区二区三区亚洲欧美另类在线| 亚洲欧美日韩产一区二区| 99久久久久国产精品免费| 日本a在线看| 日本欧美在线字幕|